California Transportation Commission Meeting - October 15, 2026 (Day 1)

October 15, 2026 · California Transportation Commission

Subscribe via RSS: California Transportation Commission California Transportation CommissionCalifornia Transportation Commission Meetings

Agenda

1. Roll Call

Attachments (27)

2. Welcome to the Region

Attachments (1)

3. Approval of Minutes for August 20-21, 2026

Attachments (92)

4. Commissioner Meetings for Compensation

Attachments (1)

5. Committee Member Compensation

Attachments (1)

6. Commission Chief Deputy Director

Attachments (94)

7. Commissioner and Ex-Officio Reports

Attachments (1)

8. CalSTA Undersecretary

Attachments (2)

9. Caltrans Director

Attachments (1)

10. FHWA California Division Administrator

Attachments (2)

11. Regional Agencies Moderator

Attachments (1)

12. Rural Counties Task Force Chair

Attachments (1)

13. Self-Help Counties Coalition Executive Director

Attachments (1)

14. Equity Initiatives Update • Equity Advisory Committee Update

Attachments (40)

15. State and Federal Legislative Matters

Attachments (1)

16. Budget and Allocation Capacity

Attachments (2)

17. Innovations in Transportation • Artificial Intelligence Cameras in Caltrans District 5

Attachments (3)

18. Draft Toll Facility Application Guidelines

Attachments (1)

19. 2026 Local Streets and Roads Needs Assessment

Attachments (1)

20. Delegated Authority to Allocate Funds to Respond to Emergencies Resolution G-26-74

Attachments (6)

21. Adoption of the FY 2026-27 Road Maintenance and Rehabilitation Account Local Streets and Roads Funding Subsequent Report of Eligible Cities Resolution G-26-71

Attachments (4)

22. 2026 Status Report for the Active Transportation Program

Attachments (2)

23. Fourth Quarter – Project Delivery Report – Fiscal Year 2025-26

Attachments (4)

24. Informational Reports on Allocations Under Delegated Authority -- Emergency G-11 Allocations (2.5f.(1)): $28,455,000 for 14 projects. -- SHOPP Safety Sub allocations (2.5f.(3)): $62,963,000 for six projects. -- Minor G-19-05a Allocations (2.5f.(4)): $4,719,000 for four projects.

Attachments (20)

25. STIP Amendment for Notice: 2 The Tulare County Association of Governments (TCAG) proposes to amend the 2026 STIP to program an Assembly Bill (AB) 3090 Reimbursement Project (PPNO 8113A) to advance the Project Approval and Environmental Document (PA&ED) phase of the State Route 198 and Road 148 Interchange, Safety, and Multi-Modal Project (PPNO 8113) from Fiscal Year 2028-29 to 2026-27 using local Measure R funds. Reimbursement would be scheduled over a 2-year period beginning in 2028-29. STIP Amendment 26S-13

Attachments (11)

26. STIP Amendment for Notice: 2 The City of Los Angeles proposes to amend the 2026 STIP to deprogram $15,082,000 in STIP (RIP) funds from Fiscal Year 2027-28 for the Soto Street Roadway Widening between Multnomah Street and Mission Road project (PPNO 5961), and program these funds to the new proposed Huntington Drive Multi-Modal Transportation Improvement Project, Segments 1 and 2 (PPNO 6645), for the PS&E and Construction Capital (CON Cap) phases, in Los Angeles County. STIP Amendment 26S-14

Attachments (7)

27. State Highway Projects, per Resolution G-06-08

Attachments (2)

28. Local Assistance STIP Projects, per Resolution G-13-07

Attachments (1)

29. Local Assistance ATP Projects, per Resolution G-15-04

Attachments (1)

30. Pre-Construction SHOPP Support Allocations, per Resolution G-06-08

Attachments (1)

31. Status of Allocation for SHOPP Projects

Attachments (1)

32. Fiscal Year 2025-26 Caltrans Finance Report

Attachments (1)

33. Report on Fiscal Year 2025-26 Right of Way Annual Allocation

Attachments (2)

34. Aeronautics – Acquisition and Development and Airport Improvement Program

Attachments (2)

35. Quarterly Report – Local Assistance Annual Allocation for the Period Ending June 30, 2026

Attachments (2)

36. Fiscal Year 2025-26 – Fourth Quarter – Airspace Program Report

Attachments (2)

37. Update on the Minor B project list under the 2026-27 SHOPP Minor Construction Program

Attachments (2)

38. Proposition 1B Semi-Annual Report

Attachments (1)

39. Third Quarter – Balance Report on AB 1012 “Use It or Lose It” Provision for Federal Fiscal Year 2024 Unobligated RSTP and CMAQ Funds

Attachments (6)

40. Proposition 1A High-Speed Passenger Train Bond Program – Semi-Annual Report for Fiscal Year 2025-26

Attachments (2)

41. Fiscal Year 2025-26 Senate Bill 1 Semi-Annual Report

Attachments (1)

42. Final Close-Out Report on the 2025-26 Minor Program Annual Allocation

Attachments (1)

43. Fiscal Year 2025-26 Local Transportation Climate Adaptation Program Semi-Annual Report

Attachments (2)

44. Transit and Intercity Rail Capital Program (TIRCP) – Program Update

Attachments (2)

45. State Transportation Improvement Program (STIP) 2 Amendment for Action: The San Diego Association of Governments proposes to amend the 2026 STIP to deprogram $62,000,000 in STIP (IIP) funds programmed in Fiscal Year 2028-29 and delete the project from the 2026 STIP to advance construction of the San Dieguito Bridge Replacement, Double Track and Special Events Platform Project (San Dieguito Phase 2) (PPNO CP119) in San Diego County using alternative funding sources. STIP Amendment 26S-11

Attachments (3)

46. STIP Amendment for Action: 2 The Department, Contra Costa Transportation Authority (CCTA), and the Metropolitan Transportation Commission (MTC) propose to amend the 2026 STIP to deprogram $7,500,000 in STIP (RIP) funds currently programmed to the Plans, Specifications, and Estimate (PS&E) phase of the SR4 Operational Improvements – Phase 1 project (0299A) and program these funds to the Construction phase of the I-80/San Pablo Dam Interchange-Phase 2 project (PPNO 0242K) in Contra Costa County, in Fiscal Year 2028-29. STIP Amendment 26S-12

Attachments (6)

47. Approval of Project for Future Consideration of Funding: 2 03-Sacramento County Alta Arden Expressway Phase I Provide sidewalks, bicycle lanes, rehabilitation, and resurfacing. (MND) (PPNO 1923) (STIP) Resolution E-26-74 (Related Item under Ref.: 2.5c.(3))

Attachments (7)

48. Approval of Project for Future Consideration of Funding: 2 03-Sacramento County Laguna Creek Inter-Regional Trail Crossing over State Route 99 Provide a pedestrian overcrossing and multi-use trail. (MND) (PPNO 5402) (ATP) Resolution E-26-75 (Related Item under Ref.: 2.5w.(2))

Attachments (4)

49. Approval of Project for Future Consideration of Funding: 2 03-Sacramento County Zinfandel Drive Bicycle and Pedestrian Overcrossing Provide a bicycle and pedestrian overcrossing and Class 1 path. (MND) (PPNO 5406) (ATP) Resolution E-26-76

Attachments (2)

50. Approval of Five Projects for Future Consideration of 2 Funding: 01-03-Sie-89, PM 0.0/15.2 Henness Pass CAPM Project The project will preserve and extend the life of existing pavement on State Route 89, rehabilitate or replace culverts, upgrade metal beam guardrail, replace an existing census station, and construct a maintenance vehicle pullout on State Route 89 in Sierra County, between Post Miles 0.0 to 15.2, south of Sierraville. (MND) (PPNO 8028) (SHOPP) Resolution E-26-77 (Related Item under Ref.: 2.5b.(2)) 02-04-Sol-12, PM 14.10/20.68 Solano State Route 12 Pavement Preservation Perform pavement preservation including pavement dig- outs, cold planing, and asphalt concrete overlay and dikes; installing centerline and shoulder (edgeline) rumble strips; shoulder widening; and constructing drainage improvements. The proposed project will also upgrade metal beam guardrail, upgrade traffic signing panels, and delineate pavement. (MND) (PPNO 2921D) (SHOPP) Resolution E-26-68 (Related Item under Ref.: 2.5b.(2)) 03-05-SLO-166, PM 8.9/16.0 State Route 166 Capital Preventive Maintenance Project Preserve 14.2 lane miles of Class III pavement, restore three drainage systems, and upgrade five guardrail locations to Manual for Assessing Safety Hardware standards. (MND) (PPNO 3071) (SHOPP) Resolution E-26-69 (Related Item under Ref.: 2.5b.(2)) 04-08-Riv-371, PM 67.1/67.4 SR-371 Install Left Turn Lane Project Construct left turn lane in the westbound direction of State Route 371 at the Homestead Road intersection. The proposed project will also include constructing a Modified Concrete Barrier in the eastbound direction of State Route 371, construction of cut slopes and embankment slopes, and minor grading work. (MND) (PPNO 3021J) (SHOPP) Resolution E-26-71 (Related Item under Ref.: 2.5b.(2)) 05-08-SBd-38, PM 7.0/46.6 SR-38 Upgrade Guardrail End Treatments, Culverts, and Correct Grading Project Correct grading and upgrade end treatments of existing guardrail and culverts along State Route 38 from Post Mile 7.0 to 46.6 in San Bernardino County, California. (MND) (PPNO 3014V) (SHOPP) Resolution E-26-72 (Related Item under Ref.: 2.5b.(2))

Attachments (18)

51. Approval of Project for Future Consideration of Funding: 2 07-LA-71, PM R0.5/R4.7 08-SBd-71, PM R0.0/R0.2 State Route 71 Freeway Upgrade and Interchange Improvement Project This project involves upgrading State Route 71 from a combination of 4-lane expressway and 6-lane freeway into an 8-lane freeway, with 3 mixed-flow lanes and 1 High Occupancy Vehicle (HOV) lane in each direction between Interstate 10 and the Los Angeles/San Bernardino County line in both counties. This will be achieved by widening or restriping to add either one or two lanes depending on the location. Additional improvements include replacing two railroad overhead bridges with raised profiles to meet current vertical clearance standards, replacing an existing pedestrian overcrossing, and eliminating local crossings between Mission Boulevard (Blvd) and Rio Rancho Road. The project will also repave the roadway, reconstruct on- and off-ramps at Valley and Mission Blvd, as well as the southbound Rio Rancho Road off-ramp. In addition, paving and striping 0.2 miles into San Bernardino County to maintain HOV lane continuity. Furthermore, the project includes constructing soundwalls and retaining walls, installing Permanent Best Management Practices, and shifting the centerline alignment westward from Mission Blvd to Old Pomona Road to minimize right of way impacts. (MND Addenda) (PPNO 2741) (STIP) Resolution E-26-73A 05-SLO-101-PM 61.7/62.2 Right of way along United States Highway 101 on San Paso Circle and Wellsona Road, in the county of San Luis Obispo Resolution R-4130

Attachments (6)

54. Director’s Deeds Items 1 through 10 Excess Lands - Return to State: $1,366,000

Attachments (5)

55. Director’s Deeds Items 1 through 10 Highway 50 Soundwall Excess Lands - Return to State $0 Successor Trustee of the Thomas P. Altenreuther 2018 Revocable Trust Under Instrument Dated June 6, 2018 Separate Property 04-Son-116-PM 39.3 EA 2Q7709

Attachments (7)

57. State Highway Operation and Protection Program 2 (SHOPP) – Allocation Amendment Request to amend the SHOPP Commercial Vehicle Enforcement Facilities project, in Los Angeles County, to rescind the full amount of $572,000 from the PA&ED phase due to the request being inadvertently submitted at the June 2026 Commission meeting. (PPNO 6244) Resolution FP-26-21, Amending Resolution FP-25-107

Attachments (5)

58. STIP – Allocation Amendment Request to amend the State-Administered STIP Feather River Inn Intersection Improvement project, on the State Highway System, in Plumas County, to include the original request to extend the period of project completion an additional 6 months beyond the 36-month Timely Use of Funds deadline, due to an administrative error. There is no change to the allocation amount. (PPNO 3703) Resolution FP-26-22, Amending Resolution FP-22-47 (Related Items under Ref.: 2.8c.(1) and 2.8c.(3))

Attachments (6)

59. STIP – Allocation Amendment Request to amend the State-Administered STIP SR 99/120 Connector Project Phase 1B, on the State Highway System, in San Joaquin County, to move $1,200,000 from Right of Way (RW) Capital to RW Support. There is no change to the allocation amount. (PPNO 3162B) Resolution FP-26-23, Amending Resolution FP-25-113

Attachments (3)

60. Multi–funded STIP, Local Partnership Program (LPP) (Formulaic), Trade Corridor Enhancement Program (TCEP), and Proposition 1B Trade Corridor Improvement Fund (TCIF) – Allocation Amendment Request to amend the locally-administered multi-funded STIP, LPP (Formulaic), TCEP, and Proposition 1B TCIF I-10 Corridor Express Lanes Contract 1 project, on the State Highway System, in San Bernardino County, to split the original Proposition 1B TCIF allocation between two Budget Authority fiscal years. There is no change to the allocation amount. (PPNO 3009P) Resolution FP-26-25, Amending Resolution FP-17-77 Resolution LPP-A-2627-06, Amending Resolution LPP-A-1718-13 Resolution TCEP-A-2627-06, Amending Resolution TCEP-A-1718-05 Resolution TCIF-AA-2627-13, Amending Resolution TCIF-A-1718-04

Attachments (3)

61. TCEP – Allocation Amendment Request to amend the State-Administered TCEP Yolo 80 Corridor Improvements Project - Phase 1, on the State Highway System, in Yolo County, to correct the State and Regional splits for the Construction, Construction Support, and Right of Way Support phases for the TCEP-State and TCEP-Regional funding amounts. There is no change to the allocation amount. (PPNO 8922A) Resolution TCEP-A-2627-07, Amending Resolution TCEP-A-2324-17

Attachments (5)

62. TCEP – Allocation Amendment Request to amend the locally-administered TCEP Green Power Microgrid – Harbor Facilities Component project, off the State Highway System, in Alameda County, to deallocate $3,632,000 from the Construction (CON) phase due to a program amendment approved by the Commission in June 2026. (PPNO 2090S) Resolution TCEP-A-2627-09, Amending Resolution TCEP-A-2425-25 (Related Item under Ref.: 4.9)

Attachments (2)

63. TCEP – Allocation Amendment Request to amend the locally-administered TCEP Route 605/91 Interchange Improvement: Gateway Cities Freight Crossroads Project, on the State Highway System, in Los Angeles County, to deallocate $69,670,000 from the CON phase due to lapsed access to funds. (PPNO 5388) Resolution TCEP-A-2627-10, Amending Resolution TCEP-A-2324-26

Attachments (5)

64. Solutions for Congested Corridors Program (SCCP) – Allocation Amendment Request to amend the locally-administered SCCP Dry Creek Greenway Multi-Use Trail Project, off the State Highway System, in Placer County, to revise the PPNO from 1526 to 1526A, and the ATP allocation note, and add the combined project note. There is no change to the allocation amount. Resolution SCCP-A-2627-01, Amending Resolution SCCP-A-2223-09 (Related Item under Ref.: 2.5w.(6))

Attachments (4)

65. Active Transportation Program (ATP) – Allocation Amendment Request to amend the locally-administered ATP Dry Creek Greenway Multi-Use Trail Project, off the State Highway System, in Placer County, to add the combined project note and infrastructure note. There is no change to the allocation amount. (PPNO 1526A) Resolution FATP-2627-06, Amending Resolution FATP-2223-23 (Related Item under Ref.: 2.5s.(15))

Attachments (3)

66. Multi–Funded Transit & Intercity Rail Capital Program (TIRCP) and Proposition 1B Intercity Rail (ICR) – Allocation Amendment Request to amend the multi–funded TIRCP and Proposition 1B ICR (2018:12) Building Up: LOSSAN North Improvement Program (Canada Honda Bridge Replacement) component, in Santa Barbara County, to deallocate $49,000 from the CON phase to reflect component savings. (PPNO CP042B) Resolution TIRCP-2627-19S, Amending Resolution TIRCP-2425-43S Resolution ICR1B-AA-2627-01S, Amending Resolution ICR1B-A-2425-02S

Attachments (4)

67. TIRCP – Allocation Amendment Request to amend the TIRCP (2020:16) Improving Air Quality and the Economic Growth with Electric Buses in Merced County, the Gateway to Yosemite (Procurement of 3 Zero-Emission Buses) component, to deallocate $478,000 from the CON phase to reflect component savings. (PPNO CP074) Resolution TIRCP-2627-20, Amending Resolution TIRCP-2021-06

Attachments (8)

68. TIRCP – Allocation Amendment Request to amend the TIRCP (2020:04) Inglewood Transit Connector Project (Design for Inglewood Transit Connector Project Phase 1) component, in Los Angeles County, to revise the project description. There is no change to the allocation amount. (PPNO CP062D) Resolution TIRCP-2627-21, Amending Resolution TIRCP-2425-63

Attachments (1)

69. TIRCP – Allocation Amendment Request to amend the TIRCP (2022:21) Sonoma Regional Bus and Rail Connectivity Improvements (Real-Time Sign Installation) component, in Sonoma County, to rescind the full amount of $50,000 from the CON phase due to the lack of infrastructure services. (PPNO CP100S) Resolution TIRCP-2627-22, Amending Resolution TIRCP-2526-47 (Related Item under Ref.: 2.6g.(1))

Attachments (2)

70. TIRCP – Allocation Amendment Request to amend the TIRCP (2018:27) Southern California Optimization Rail Expansion (SCORE) (Link US - West Bank Tie-in 1) component, in Los Angeles County, to rescind the full amount of $54,385,000 from the CON phase due to an update to the delivery contract. (PPNO CP033) Resolution TIRCP-2627-23, Amending Resolution TIRCP-2526-47

Attachments (3)

71. TIRCP – Allocation Amendment Request to amend the TIRCP (2018:26) SMART Larkspur to Windsor Corridor (Windsor to Healdsburg North Extension) component, in Sonoma County, to deallocate $800,000 from the PS&E phase to reflect component savings. (PPNO CP041B) Resolution TIRCP-2627-24, Amending Resolution TIRCP-2526-45 (Related Items under Ref.: 2.6g.(2) and 2.6s.(8))

Attachments (1)

72. TIRCP – Allocation Amendment Request to amend TIRCP (2022:01) ATN FAST (Family of Advanced Solutions for Transit): Revolutionizing Transit for a Global Audience project, in Orange County, to rescind a combined total of $14,574,000 from the CON phase of four components due to project termination. • $877,000 from the Purchase 7 ZEV vans for EVE: New Airport Connection & Night Owl) component. (PPNO CP086) (2.6g.(10a)) Resolution TIRCP-2627-25, Amending Resolution TIRCP-2425-74 • $313,000 from the Purchase of 10 (5 passenger) ZEV Microtransit for FRAN component. (PPNO CP086A) (2.6g.(10b)) Resolution TIRCP-2627-26, Amending Resolution TIRCP-2425-74 • $12,836,000 from the Purchase of 15 - 40' Zero Emission Buses for ART Fleet Conversion component. (PPNO CP086C) (2.6g.(10c)) Resolution TIRCP 2627-27, Amending Resolution TIRCP-2425-74 • $548,000 from the Capital Outlay ANNA Corridor component. (PPNO CP086D) (2.6g.(10d)) Resolution TIRCP-2627-28, Amending Resolution TIRCP-2223-82

Attachments (12)

73. Approval of Two 2022 Trade Corridor Enhancement Program Baseline Agreement Amendments Resolution TCEP-P-2627-01BA, Amending Resolutions TCEP-P-2425-01BA and TCEP-P-2324-07B (Related Item under Ref.: 2.5s.(13))

Attachments (3)

74. Approval of the 2024 Baseline Agreement Amendment for the Forum Mobility – Beyond the Dock: Heavy-Duty Electrification of the Port of Oakland Priority Trade Corridors Project Resolution TCEP-P-2627-02BA, Amending Resolution TCEP-P-2526-08B

Attachments (2)

75. Approval of 2023 Active Transportation Program Baseline Agreement for the Harden Parkway Safe Routes to School project. Resolution ATP-P-2627-03B (Related Item under Ref.: 2.5w.(1))

Attachments (2)

76. Approval of two State Highway Operation and Protection Program Baseline Agreements Resolution SHOPP-P-2627-02B

Attachments (2)

77. Approval of Report on the Status of the Transit and Intercity Rail Capital Program Loan (Assembly Bill 117)

Attachments (3)

78. Airspace Lease Program Update

Attachments (1)

79. Airspace Lease – Request to Directly Negotiate Items 1 through 8

Attachments (2)

80. Director’s Deed Item 1 Roberti Fair Market Value Buyer Excess Lands - Return $765,000 to State Route 710 Rehabilitation Account

Attachments (3)

81. Request for an additional $5,447,000 (16.8 percent 2. increase) in Pre-Construction Right of Way (RW) Capital, for the TCEP Tulare SR 99 Corridor and Paige Avenue Multimodal Interchange Enhancements project on State Route 99, in Tulare County. (EA 48950, PPNO 6369) Resolution TCEP-A-2627-11S

Attachments (5)

82. Request for an additional $300,000 (14.1 percent 2. increase) in Pre-Construction Support for the PA&ED phase, for the SHOPP Bridge Rehabilitation and Replacement project on State Route 96, in Siskiyou County. (EA 0H730, PPNO 3660) Resolution FA-26-07

Attachments (3)

83. Request for an additional $1,200,000 (9.0 percent 2 increase) in Construction Support for the SHOPP Bridge Rehabilitation and Replacement project on United States Highway 101, in Del Norte County. (EA 43640, PPNO 0100V) Resolution FA-26-08 (Related Item under Ref.: 2.8v.(3))

Attachments (4)

84. Request for an additional $2,800,000 (32.9 percent 2 increase) in Construction Support for the SHOPP Bridge Formula Program project on State Route 20 and Interstate 80, in Nevada and Placer counties. (EA 3H560, PPNO 4305) Resolution FA-26-09

Attachments (3)

85. Request for an additional $750,000 (33.4 percent 2 increase) in Construction Support, for the SHOPP Safety Improvements project on State Route 9, in Santa Cruz County. (EA 1M400, PPNO 3012) Resolution FA-26-10

Attachments (3)

86. Request for an additional $3,574,000 (14.7 percent 2 increase) in Construction Capital and $1,189,000 (30.6 percent increase) in Construction Support, for the SHOPP Roadway Rehabilitation project on State Route 216, in Tulare County. (EA 0W90U, PPNO 8039) Resolution FA-26-11

Attachments (3)

87. Request for an additional $1,700,000 (23.3 percent 2 increase) in Construction Capital for the SHOPP Americans with Disabilities Act Curb Ramps project on State Route 116, in Sonoma County. (EA 4J460, PPNO 1491B) Resolution FA-26-12

Attachments (3)

88. Request for an additional $800,000 (55 percent 2 increase) for the PS&E phase of the TIRCP (2018:26) SMART Larkspur to Windsor Corridor (Windsor to Healdsburg) component, in Sonoma County. (PPNO CP041A) Resolution TIRCP-2627-29S (Related Items under Ref.: 2.6g.(9) and 2.6s.(8))

Attachments (4)

89. SHOPP Amendments for Approval: 2 Request to: --Add 22 new projects into the 2026 SHOPP. (2.1a.(1a) and 2.1a.(1b)) --Revise 16 projects currently programmed in the 2026 SHOPP. (2.1a.(1d)) SHOPP Amendment 26H-004 (Related Items under Ref.: 2.5b.(1) and 2.5b.(2))

Attachments (7)

90. Director’s Orders Annual Close-out Report for Fiscal Year 2025-26

Attachments (1)

91. 2024 Trade Corridor Enhancement Program Amendment Amendments to the Coastal Rail Infrastructure Resiliency Project and the Pennsylvania Avenue Grade Separation Project Resolution G-26-73, Amending Resolution G-26-57 (Related Item under Ref.: 2.6s.(9))

Attachments (2)

92. Local Partnership Formulaic Program Amendment Add the Downtown Pedestrian and Bicycle Crossing of US 101 project in Sonoma County and program $1,117,000. Resolution LPP-P-2627-03, Amending Resolution LPP-P-2627-01

Attachments (2)

93. Local Assistance (Federal) – Annual Allocation Request of $2,739,885,000 in Federal Funds for Local Assistance Annual Allocation for Fiscal Year 2026–27. Resolution FM-26-01

Attachments (3)

94. Request of $120,294,000 for 10 SHOPP projects. 2 Resolution FP-26-26 (Related Item under Ref.: 2.1a.(1))

Attachments (4)

95. Request of $47,035,000 for 35 2026 SHOPP 2 preconstruction project phases for environmental support, design, and RW support. Resolution FP-26-27 (Related Items under Ref.: 2.1a.(1) and 2.2c.(1))

Attachments (5)

96. Request of $300,000 for the locally-administered STIP 2 SR 49 San Andreas Southern Gateway Improvements Project, on the State Highway System, in Calaveras County. (PPNO 3724) Resolution FP-26-28

Attachments (3)

97. Request of $4,993,000 for seven locally-administered 2 STIP and Planning, programming, and Monitoring projects off the State Highway System. Resolution FP-26-29 (Related Item under Ref.: 2.2c.(3))

Attachments (5)

98. Request of $123,000 for the locally-administered LPP 2 (Formulaic) Aten Boulevard Rehabilitation Project between Old State Route 86 and the West Right-of-Way Line of the Southern Pacific Railroad, off the State Highway System, in Imperial County. (PPNO 1618) Resolution LPP-A-2627-07

Attachments (4)

99. Request of $162,207,000 for the locally-administered 2 multi-funded SCCP, LPP (Competitive and Formulaic), and TIRCP Sonoma-Marin Area Rail Transit District (SMART) Healdsburg Extension Project, in Sonoma County. (PPNO 2364N) Resolution SCCP-A-2627-02 Resolution LPP-A-2627-08 Resolution TIRCP-2627-30 (Related Items under Ref.: 2.6g.(2) and 2.6g.(9))

Attachments (3)

100. Request of $64,257,000 for the multi-funded TCEP and 2 TIRCP (2024:16) Coastal Rail Infrastructure Resiliency Project (Sand Replenishment), in Orange County. (PPNO CP171E) Resolution TCEP-A-2627-15 Resolution TIRCP-2627-32 (Related Item under Ref.: 4.15)

Attachments (5)

101. Request of $15,084,000 for the locally-administered 2 multi-funded TCEP and STIP Hueneme Road Widening - Edison Drive to Rice Avenue project, off the State Highway System, in Ventura County. (PPNO 6464) Resolution TCEP-A-2627-12 Resolution FP-26-30

Attachments (4)

102. Request of $3,653,000 for the locally-administered TCEP 2 Long Beach-East Los Angeles Corridor Zero-Emissions Truck Project (MN8 Energy), off the State Highway System, in Los Angeles County. (PPNO Z004B) Resolution TCEP-A-2627-13

Attachments (2)

103. Request of $7,900,000 for the State-Administered TCEP 2.5 EV Realty - South Bay Truck Charging Hub project, off the State Highway System, in Los Angeles County. (PPNO Z003) Resolution TCEP-A-2627-16

Attachments (2)

104. Request of $16,029,000 for nine locally-administered 2. ATP projects, off the State Highway System. Resolution FATP-2627-07 (Related Items under Ref.: 2.8v.(6) and 4.11)

Attachments (4)

105. Request of $6,874,000 for the locally-administered ATP 2. Laguna Creek Inter-Regional Trail Crossing at State Route 99 project, on the State Highway System, in Sacramento County. (PPNO 5402) Resolution FATP-2627-08 (Related Item under Ref.: 2.2c.(4))

Attachments (4)

106. Request of $106,625,000 for 11 TIRCP projects. 2 Resolution TIRCP-2627-31 (Related Item under Ref.: 2.6g.(6))

Attachments (5)

107. Request to extend the period of contract award for the 2 SHOPP Safety Improvements project, in San Luis Obispo County, per SHOPP Guidelines. (PPNO 2766Y) Waiver 26-191

Attachments (4)

108. Request to extend the period of project completion for 2 six SHOPP projects, per SHOPP Guidelines. Waiver 26-192 (Related Items under Ref.: 2.5c.(4), 2.8c.(2), and 2.8c.(3))

Attachments (9)

109. Request to extend the period of project development 2 expenditure for six SHOPP projects, per SHOPP Guidelines. Waiver 26-193

Attachments (3)

110. Request to extend the period of contract award for four 2 locally-administered STIP projects, off the State Highway System, per STIP Guidelines. Waiver 26-194

Attachments (3)

111. Request to extend the period of project completion for 2 the State-Administered STIP I-5 North Coast Corridor HOV Extension, Phase 1, Carlsbad Seg, Package 3 (CMGC) project, on the State Highway System, in San Diego County, per STIP Guidelines. (PPNO 0615I) Waiver 26-195 (Related Item under Ref.: 2.8c.(1))

Attachments (2)

112. Request to extend the period of project completion for 2 the State-Administered STIP Feather River Inn Intersection Improvement project, on the State Highway System, in Plumas County, per STIP Guidelines. (PPNO 3703) Waiver 26-196 (Related Items under Ref.: 2.5c.(4) and 2.8c.(1))

Attachments (1)

113. Request to extend the period of project completion for 2 the State-administered multi-funded STIP and LPP (Competitive and Formulaic) US 101 Hearn Avenue Regional Multimodal Interchange project, on the State Highway System, in Sonoma County, per STIP and LPP (Competitive and Formulaic) Guidelines. (PPNO 0785C) Waiver 26-197

Attachments (3)

114. Request to extend the period of contract award for the 2 locally-administered ATP Downtown Long Beach Walkable Corners project, off the State Highway System, in Los Angeles County, per ATP Guidelines. (PPNO 5865A) Waiver 26-198

Attachments (3)

115. Request to extend the period of project completion for 2 four locally-administered ATP projects, off the State Highway System, per ATP Guidelines. Waiver 26-199

Attachments (2)

116. Request to extend the period of contract award for two 2 TIRCP (2024:27) UCLA/Westwood Zero Emission Transit Service Expansion: Deploying Wireless Charging at Scale components, in Los Angeles County, per TIRCP Allocation Policy. Waiver 26-200

Attachments (3)

117. Request to extend the period of project completion for 2 the TIRCP (2020:02) Transbay Corridor Core Capacity Program (Vehicle Acquisition) component, in various counties, per TIRCP Allocation Policy. (PPNO CP060) Waiver 26-201

Attachments (2)

118. Post-Fact request to extend the period of project 2 development expenditure for two phases of the locally- administered ATP La Vina Community Mobility and Safety Enhancements Project, off the State Highway System, in Madera County. (PPNO 8017) Waiver 26-210

Attachments (3)

119. Request to amend the period of project completion for 2 the SHOPP Mobility project, in Ventura County, as an exception to SHOPP Guidelines. (PPNO 5255) Waiver 26-203, Amending Waiver 25-172

Attachments (4)

120. Request to amend the period of project development 2 expenditure for the SHOPP Bridge Preservation project, in Del Norte County, as an exception to the SHOPP Guidelines. (PPNO 0100V) Waiver 26-204, Amending Waiver 23-171 (Related Item under Ref.: 2.5e.(1))

Attachments (3)

121. Request to amend the period of contract award for the 2 SCCP Los Angeles Metro CORE Capacity & System Integration Project (Replacement-TPSS), in Los Angeles County. (PPNO 6210A) Waiver 26-206, Amending Waiver 26-121

Attachments (4)

122. Request to amend the period of project allocation for 2 three locally-administered ATP projects, off the State Highway System. Waiver 26-207, Amending Waivers 25-79 and 25-126 (Related Item under Ref.: 2.5w.(1))

Attachments (4)

123. Request to amend the period of project completion for 2 the locally-administered ATP San Diego Regional Border to Bayshore Bikeway Project, off the State Highway System, in San Diego County. (PPNO 1232) Waiver 26-208, Amending Waiver 25-156 Public Comment

Attachments (243)

Agenda Items

  1. 00:04:41 Welcome to the Region Hanford and Kings County officials outlined local road safety, agricultural freight, and passenger rail needs, including challenges meeting project matching requirements.
  2. 00:14:31 Commission Chief Deputy Director The chief deputy reviewed commission activities, upcoming funding opportunities and emergency-response proposals, and the deaths of six contractor employees in active work zones.
  3. 00:22:52 Commissioner and Ex-Officio Reports Commissioners discussed regional tours, road safety concerns, rail and active transportation investments, and welcomed new Commissioner Nancy Miller.
  4. 00:40:26 CalSTA Undersecretary Undersecretary James Hacker reported on safety corridors, traffic fatality prevention, business participation, climate initiatives, freight investments, autonomous trucks, and electric vehicle charging.
  5. 01:00:05 Caltrans Director Caltrans Chief Financial Officer Stephen Kett began the department's update by acknowledging earlier comments about recent worker fatalities.

Transcript

Warning: This transcript is automatically generated by machine and may contain errors, including misheard words, misattributed speakers, and omitted passages. Always listen to the audio or video recording before assuming the transcript correctly reflects what was said. Do not rely on the transcript alone for quotation, reporting, or any other purpose where accuracy matters.
The home region of our beloved commissioner Leanne Eager we will
get started with roll call Douglas thank you
Commissioner Bradshaw Vice Chair Cruz commissioner Brown Heinz commissioner
Eager here commissioner grizzby present commissioner Gordino present
Commissioner man. Commissioner Miller here. Commissioner we see you online. Are you able to make that come? Yeah. Can you not hear me? I said present. Okay. Thank you. Commissioner Tiffany. Thank you. Commissioner Tiffany we see you.
Chair Falcone? Here. Senator Cortese? Assemblymember Wilson?
Madam Chair we have a quorum. Thank you Douglas and if you may continue
instructions for public participation please. Thank you. Welcome to day one of
the October 2026 CTC meeting in Hanford, California. Please note that because this
is a two-day meeting you will need to use a separate link to attend the
meeting tomorrow. The links can be found on the first page of the meeting agenda
on our website. Please use the questions tab if you have questions about this.
The meeting agenda is located on our website at www.cattc.ca.gov. All of the presentations
for today's meeting are also available on the commission meetings page of our website
under the view download meeting materials tab. Any document the CTC creates can be translated
into any language you need. Simply email us at ctc.ca.gov and we'll have them return to you as
quickly as possible. American Sign Language Translation is being provided on the webinar
for this meeting. You should see the translators on your screen. Live closed captioning is also
available. Please select the show captions tab at the bottom of your screen. There are a number of
language options available there to choose from. Presenters, if you're on the agenda to make a
presentation, please do your best to be succinct. Please remember to speak at a steady pace to allow
our translating services adequate time for accurate translation. If you are presenting remotely,
we hope that you will turn on your camera during your presentation if you have one.
For the members of the public, we welcome comments from the public as part of each item at this
meeting. For those attending in person please submit a speaker slip to the
clerk that's me at the front of the room so let us know you want to comment on an
item. For those attending via Zoom you should see the webinar control panel
likely located at the bottom of your screen. There you'll find the raise hand
and Q&A tabs. We encourage you to use a raise hand feature as early into the
item as you can to give the system time to acknowledge you. Commissioned staff
will let you know when it's your turn to make your comment. Alternately you may
use a Q&A tab to submit your comment. Please be sure to include the agenda item
number you are commenting on. Commission staff can read the comment on your
behalf. As a reminder each registered attendee is provided a unique link and
phone number to access the webinar. These should not be shared with other
participants as this can create confusion for staff when calling on you
to make your comments. For all of our meeting attendees please do your best to
be concise with your comments. Please make sure your comments add new
information. If you agree with the comments of a previous speaker, simply
make that statement. Please remember to speak at a steady pace to allow our
translating service adequate time for accurate translations. Since we often have
many speakers, we ask that you make your point in two minutes or less. If for some
reason we have many speakers on any single topic, we reserve the right to
limit comments to one minute if needed. Thank you for joining us today. We know
your time is valuable and we appreciate you sharing some of it with us. Thank you
Thank you so much, Douglas. Before we move forward with welcome to the region, I want to welcome and very excited to welcome our new Commissioner, Commissioner Nancy Miller.
Looking forward to hearing from you during our Commissioner comments, but it's great to have you on board. Looking forward to working with you, as all of our colleagues are on the dais.
2. Welcome to the Region
and welcome to the region. We'd love to call up Mayor Mark Harris from the city of Hanford
and Supervisor Doug Verboon. Good afternoon Madam Chair, Mr. Vice Chair, commissioners and staff.
My name is Mark Kyris. I'm the City of Hanford's Mayor. It's my honor to welcome the California
Transportation Commission and guests to our great city located in the heart of California's Central
Valley. Hanford is approximately 200 miles away from many of our state's
urban centers. San Francisco, Sacramento, and Los Angeles. I'm happy and fortunate
to live in a place where I can get up early, drive to any of those mentioned
destinations, and still make it home in time to have dinner with my wife,
children, and grandchildren. Although I must say, my definition of early morning
may be quite different from most other people. Don't get me wrong there are
many advantages to being centrally located. I also believe we have reached
a moment in time when we ourselves sell ourselves short in touting that we are
in close proximity to the mountains and the beach. The truth is there is much to
be excited about here in the city of Hanford. Today on your tour you learned
about some of the transformational transportation projects we have planned.
Some projects are going to be completed within the next few years and others are
going to require more funding and are going to be completed farther down the
road, no pun intended. But at their core these projects are designed to make
life easier and safer for our residents visitors to travel in and around our
city in whatever chosen chosen appropriate form of transportation they
need. So in closing I hope you all have a pleasant visit here in the city of
Hanford in King's County. Don't work too hard. I will say I saw the agenda it's
quite comprehensive so I don't know that I could say that easily standing here but
try to find some time tonight to enjoy Main Street Hanford's Thursday night
marketplace which will be right outside the Civic Center here. It's one of
California's finest farmers markets around. And also be sure to save a little
room for a sweet treat that we included in your brochure from Superior Dairy as
a token of our appreciation from the City of Hanford. Again thank you and
welcome to the City of Hanford. Very nice Mark. My name is supervisor Doug Verbone.
I'm a resident here in King's County. I'm also on the board of supervisors
I want to thank the Commission for taking time out of their busy schedule to be here in Hanford
I want to especially thank Commissioner here
For making a point about 11 months ago to point out that we need to be here to show off our new station
At this time I'd like to introduce my CEO for a county of Kings Kerry Martinez, and I have a board member here
Supervisors Richard Valley from the Corcoran area he's here as well, and we also have a guest here today
he's winding down of her career, 42 years at the County of Kings with the
Council of Governments, Terri King. So this will probably be our last meeting here.
She's one of those retirees that really can't let go. We're having a hard time
getting rid of her, but she's done a great job and we want to show her respect.
As you drove around today, you saw our projects and our wishes and our wants in
the future and, you know, ag is real important here in Kings County. We have
of 153,000 people, we make $2.5 billion in ag economy,
and the ratio of that is really good.
So the farm to market relative transportation
is key to getting our products to market,
and we appreciate all you've done for us.
I also sit on the Gold Runner,
the San Joaquin Joint Power Association,
on the chairman of the Gold Runner right now,
and I want to thank you for your support
for our Valley Rail program.
With the funds you gave us,
we did groundbreaking yesterday in Oakley,
and so we're very proud of that.
Looking forward to the things we can do together.
And we love anything that would come forward in the future
when it comes to improving our on-time performance
for Amtrak, we'd really appreciate it.
I would love to have a train every two hours,
16 hours a day in the Central Valley
from the Bay Area to Bakersfield.
I think that'd be really cool
to meet our on-time performance
and really reliable on transportation.
We would love to go to the new model
where people ride bikes and take buses
and do stuff like that, but we live in a valley.
And last year we had 90 days of 100 degrees plus,
So it's kind of hard.
Most of us are car based cultures and we drive a lot.
So we do appreciate anything you can do to improve our roads.
You know, you went today, you went down Highway 41,
you saw our possible future overpass, 9th Avenue,
12th Avenue overpass, 19th Avenue overpass,
and the 41 overpass and you went to Fresno County
to install the Excelsior Expressway.
King's County supported the Excelsior Expressway,
it's not in King's County,
but we like to work with our neighbors.
We like to work with all our neighboring counties to get funding to improve our transportation issues, so
We need that a lot one thing
I want to point out here in King County it's kind of special to me is you know you when you turned off
198 on the 41 that overpass there the dirt they got for that they dug up pit
About four miles to the south that is now the world surf ranch where they have world-class surfing here
And it's 300 days a year. We do world-class surfing here in the inside of the state of California
really cool. A lot of influential people come here. Out of 365 days a year, 300 days of it,
people are surfing there every day, so it's pretty cool. Like I said, I've been a member of this county
for 63 years myself. My family has been here for 120 years across the street of Superior Dairy.
My grandfather dated the owner's daughter of Superior Dairy back in the 30s.
My girlfriend worked there in the 80s. Two of my kids worked there, and I never paid for an
an ice cream my entire life. But the best ice cream in the world. Award-winning chocolate.
They've taken the preservers out. It's the best ice cream in the world. It recently got
purchased from the original family last year from a distant cousin of mine. The third generation
of the Zunoville family purchased it and did a major remodel now. So that's a pretty good
deal for our community. A lot of famous people come here and eat ice cream. The train that
we have, when we have our train meeting here for the JPA, sometimes we have to move our
ourselves to another car because we have cars full
from Fresno, Madera, Merced and Atwater coming here
just to have ice cream.
And so that's really cool.
So enjoy our community.
We thank you for being here
and any support we can have in the future is great.
We're a low to moderate income community
and we have a hard time doing the matching fund projects.
So anything you guys can do to help us out in the future,
we appreciate.
So thank you again.
Yeah. Awesome.
Yeah, that's a good question.
We have a question from Commissioner Guardino.
Thank you, Supervisor, if you don't mind coming back up to the podium.
I'm not sure that I believe you that it's the best ice cream in the world.
Will you take us all out tonight for ice cream?
Yes, sir.
I would rather bring you back next year after it's open so we can sit indoors.
Oh, okay.
That'd be nice.
And then I'll take care of you then.
We'll bring ice cream to you.
Sounds great.
Thank you.
Challenge and a promise.
Thank you.
All right any public comment on our speaker's presentations?
I do not receive any request to comment on the item. Thank You Justin. Any
comments or questions from commissioners? Okay thank you again for such a warm
welcome and and showing off all the impressive things that are happening it's
rural and mighty in the Central Valley and we got to see close close-up in
personal many of the projects and initiatives that are occurring in this
wonderful region and in the state and so we look forward to continuing to work
with you thank you for having us here it's an honor to be here all right a
little bit of business we have tabs three to five um together douglas thank you chair
tabs three four and five will be voted together tab three is the approval of the minutes from
the august 20 21st meeting in san diego tab four is the commissioner's meeting for
meetings for compensation and tab five is the committee member's compensation staff recommends
I have a motion to approve.
Motion to approve.
We vote on the motion.
We didn't do it.
Do you have any request to comment on any of the group
items?
OK, great.
We have a motion from Vice Chair Cruz and second
from Commissioner Bradshaw.
All in favor?
Any opposed?
Abstentions?
OK, those items.
I would have, thank you.
Excuse me, Chair.
I would abstain just because I'm new to the board
Okay. So we have one abstention from Commissioner Miller. Thank you. All right. Next tab, tab
6. Commission Chief Deputy Director
six is our update from Chief Deputy Director Paul Goloskovsky.
Hi, good afternoon, everyone. I'm Karis and County Supervisor Verboon for welcoming the
commission to the region just now. And I'd also like to thank the King's County Association
of Governments for arranging a pair of tours yesterday and today that allowed commissioners
and staff to get an up close look at the transportation needs and projects that are
in development in the region. We appreciated the opportunity to see these projects and
hear more about the work happening in King's County. Commissioners, I wanted to take a moment
to address the medical emergency that occurred during our August meeting. First, I want to
recognize the efforts of our team and others at the meeting to ensure medical assistance
arrived promptly, as well as the staff who remained in San Diego to provide support during
weekend. I'd also like to thank California Highway Patrol Officer Anthony Alvarez for
his assistance to us when the event that our staff member who experienced the medical emergency is
home and recovering. And finally I want to say thank you to the California Transportation
Foundation for setting up a fundraiser to help cover medical and other instances and to all those
who donated. Commissioners as Chair Falcone mentioned at the beginning of the meeting,
Nancy Miller is attending her first commission meeting today virtually as a commissioner.
Commissioner Miller comes to us with a wealth of knowledge from her
Fire service and state government and we're excited to have her bringing that knowledge and experience to the Commission
We welcome you aboard Commissioner Miller and look forward to hearing from you
Commissioners since our last meeting in San Diego. We've had a busy few weeks on
September 1st the Commission and joined the Oregon and Washington Transportation Commission's for a tri-state meeting
This meeting was a valuable opportunity for our states to share knowledge and expertise and coordinate on shared transportation
challenges including climate adaptation planning and sustainable
transportation funding. Also in September, Commissioned staff held a
workshop on proposed updates to the Commission's toll facility project
application guidelines, providing stakeholders with the opportunity to
offer comments and feedback. Those draft guidelines are being presented later on
this agenda. We look forward to continuing to work with our partners and
stakeholders as we develop the updates to the guidelines. On September 17th
and 18th the Commission held its second town hall of 2026 in San Luis Obispo.
I'd like to thank the San Luis Obispo Council of Governments for hosting us
and arranging a tour highlighting local transit services and improvements along
the US 101 and State Route 227 corridor. On September, September was very busy. On
On September 25th, the commission's Road Charge Technical Advisory Committee held its final
committee meeting and heard a presentation on CalSTIS Senate Bill 339 Road Charge Pilot
Report.
This report will be presented to the commission at our upcoming December meeting.
We appreciate all of the Road Charge Technical Advisory Committee members who served on the
committee since its creation over 10 years ago to help advance this important state effort.
And lastly, earlier this month, several commissioners and staff attended the Annual Mobility 21
Conference in Anaheim, where Executive Director Taylor received the Leadership in Equity Award.
And congratulations again to Tanisha on her award.
Commissioners at this meeting, the Commission will consider approximately $3.4 billion in
project allocations, supporting transportation improvements throughout California that will
improve communities, the environment, and the economy.
In addition to this sizable investment, staff will also request action to allow the Commission
to respond more quickly to the anticipated impacts on the transportation system from
the expected severe storms associated with the upcoming El Nino, which has already started.
To help prepare for these impacts, staff will ask the Commission to delegate to the Executive
Director the authority to approve the allocation of state transportation improvement program
funds to respond to emergencies under certain conditions.
Staff plans to bring forward additional emergency response actions at the December commission
meeting.
Looking ahead, the commission's joint meeting with the California Air Resources Board and
the California Department of Housing and Community Development that had been scheduled for October
21st was canceled last week due to unforeseen circumstances.
Interagency staff is working to identify a potential date to reschedule that meeting.
In November, the Commission's Active Transportation Program staff recommendations for cycle eight
will be published.
And as a reminder, the Commission has $620 million available to award projects this cycle,
which means we can only fund 20% of the amount requested due to the tremendous demand experienced
for this program.
Also the call for Senate Bill 1 projects will close in November
back online
We'll have our chief deputy continue his report from where we lost folks online
Okay, we'll have our chief deputy continue his report
Hello again, everyone and apologies for the interrupting. So I understand I think it they cut out the audio cutout online
Right when I was reminding folks that the call for Senate bill one projects will close in November
With project nominations due between November 13th and November 20th depending on the program
After that for those of you online I introduced three new staff numbers and I will just briefly introduce them again
We have Brittany carpenter joining our planning team
Crystal Brooks joining our active transportation team and Janice lay joining our state transportation improvement program team and
Commissioners, I will conclude my report on a somber note
Since August 10th six contractor employees working on Caltrans projects have been struck and killed in active work zones
Commissioned staff expresses our condolences to the families and loved ones of those workers
work of our Caltrans and contractor partners is essential to improving the
safety of our transportation system for all users but it should not come at the
expense of lives lost or serious injury. It's critical that we all slow down move
over and be alert and driving especially in work zones. And commissioners that
concludes my report. As a reminder our next meeting will be in Palm Desert on
December 3rd and 4th. Thank you. Paul and and chair if it's appropriate to our
colleagues and and stakeholders may we close today's session in honor of those
six lives and families. Absolutely please. Thank you for the
suggestion. Commissioner Gordian will definitely do that. Thank you. All right
thank you Chief Deputy. Any public comment? Nobody did not receive any
request to comment on the item. All right thank you. Any questions or comments
7. Commissioner and Ex-Officio Reports
comments from the dais. Alright, seeing none. We will move on to tab seven, which our commissioner
reports. Any commissioners would like to make any comments at this time? Okay. We have
Commissioner Eger and then Commissioner Mann, and hopefully we will get to hear from Commissioner
Miller. Yes. Well, first I want to welcome Commissioner Miller. It's a pleasure to be
I want to say a special thank you to King's County for the last two days.
We had a tour of Lamar Naval Air Station yesterday and got to go to the top of the
tower and watch the F-35s, super secret jets, fly by and got to meet with some of the staff
there and it was an amazing tour. That was one of the things that I had put on the list
of things that I wanted to make sure that we were able to tour when we came to this
area because of all the interaction that the Moore Naval Air Station has with our transportation
system. I think there were 8,000 people living there full time but then when you add contractors
and people coming and going, you know, you're up to a small city. And the roads that surround
Lamar Naval Air Station are certainly very dangerous. And on a somber note, we left there
yesterday and looked at some of their issues. And this morning, someone was killed coming
out of Lamar Naval Air Station on a road that we had just talked about the day before. And
really shows the importance of the work that we do and the things that we need to keep in mind as
we move forward looking at where we need to put our money as far as safety goes in the state of
California. A couple of other things that I wanted to make sure that our commissioners and staff got
to see here in the beautiful county of Kings. You know, we wanted to make sure that we saw
some of the great work that they were doing out in the rural areas because that's not something
that we get to look at very often. Some of those grade crossings where, you know, the trains are
going right by as the kids are walking to school. The really important issues, the 41 in Excelsior,
where it really is a a mash between Fresno County and King's County, and the many, many lives that
that we're lost on that road that will now be four lanes
instead of two.
And we know we'll be saving lives in the future
as we continue.
I do have to say, Commissioner Gardino,
that Superior Dairy has the best ice cream on the planet,
not just in the United States.
Having grown up in this area, making sure
that I took my kids on the train,
Amtrak from Fresno to the station down here and walked to Superior Dairy. Had the ice cream
that's this high in case you haven't been there yet. And then you make your kids sick and you
go home on the train. But it's a wonderful tradition and and I know it's we're all going
to be able to share in that as we move forward. We got to go to the top of a high-speed rail
structure, a mile, a little over a mile long, and got to see the entire valley from the
top of the structure and the people that were working out there, the thousands and thousands
of people that were putting to work here in the Central Valley on high-speed rail.
The only other thing that we wanted to make sure we saw, and we're going to be able to see it when
we walk out the door, is the Steve Perry bench. So if you haven't gone out to see the Steve Perry
Bench. Steve Perry was born and raised here. I believe his dad owned a radio station and his
dad played in a band right here on this stage. So if you want to look up Journey, this is his
hometown and we'll be able to see the Steve Perry bench when we leave here this afternoon. So
a lot of right. Don't stop believing. There it is. But yes, and I want to say a special
Thank you to Terri King and her staff for all the hard work and Michael from Caltrans,
Navarro, and putting on this event these three days. And we're going to continue to enjoy this
beautiful area in the next couple days. So please go out and eat the food and eat the ice cream and
drink the coffee and enjoy yourselves. Thank you. Thank you, Commissioner Eager. I'm seeing
a evolving theme of this hearing, ice cream and journey.
Got it.
Okay, Commissioner Mann.
Thank you so much.
And welcome, Commissioner Miller.
I look forward to serving with you.
So I wanna, in my remarks, just share about,
you know, three different experiences
of seeing different projects around the state.
So earlier this year, it was in Pismo Beach
for the groundbreaking of the five cities,
multimodal transportation enhancement project that the San Luis Obispo Council of Government
and the City of Fismo Beach are working on, which will expand transportation options for
residents and visitors while improving safety and reducing traffic.
And then last month I was in Glendora for the groundbreaking of the San Dimas Wash Urban
Trail Project, which will again make it easier and safer to travel between neighborhoods,
schools and parks, while also encouraging transit usage by linking the Metro A-line
station to provide additional options for residents seeking to travel across LA County
without the need for a car, and was able to, at that event, be with the San Gabriel Valley
Council of Governments and the City of Glendora, and there were other cities there as well.
And I've really appreciated these past two days of tours, being able to yesterday go
go to the Naval Air Station and today's regional tour
and getting to see a range of projects
that are either in progress or projected efforts
from high-speed rail to an ATP project.
And when the mayor of Hanford was speaking earlier today,
when I think about all of these different projects,
I also think about his remarks,
where he talks about these projects and transportation
helping to make it easier and safer
for people to get around their communities
using whatever form of transportation they need.
And that's what I've had the pleasure of seeing
throughout our state are the measures that are important
to specific communities that we have the privilege
of being a funding partner on to see how people decide
that they makes the most sense for them to get around
in their specific community
because it is very community specific.
But thank you for allowing me to make those brief remarks.
And I just wanna thank in addition to Caltrans
and the regional team here who put on these tours.
I also wanna thank Commissioner Eager
for sharing this part of the world with us.
Thank you.
Thank you, Commissioner Mann.
Wonderful comments.
Commissioner, our new commissioner, Commissioner Miller online.
Yes, thank you.
I can't see you all and I'm sorry I'm not with you.
I had a scheduling conflict
because I love the Central Valley
and I particularly love Hanford.
And I have been to Superior Ice Cream before.
So I can attest that it is,
if not the best ice cream in the world,
I wanna say it's the best ice cream in California for sure.
So thank you for allowing me a little bit of time to speak.
I look forward to working with you.
I can't tell you what an honor it is.
I sat on high-speed rail board for a while,
but that's a very specific project.
And as you know, when you saw it,
It's a construction project, very controversial
and funding issues and all.
But I'm pleased to come to the commission
just because of the type of work that you do
and just the very basic fundamental role
that you serve in every community in this state
involving safety projects, transportation, rail.
I mean, it's just the infrastructure
that knits our state together.
And it is the most important work,
even though this state is so big and the projects,
and I saw the list, you just have enormous work
and there's never enough funding.
So I congratulate you for what you do,
and I look forward to working with you.
And I just wanna thank staff as well.
I've had a number of meetings with staff
and your well-served staff is very professional,
very organized, very efficient.
So I thank you for that.
and I look forward to serving and meeting all of you
at a later date.
Thank you.
Thank you, Commissioner Miller.
And we look forward to your perspective.
And you already get points for partaking
of the wonderful ice cream I keep hearing
about in this region.
So we all look forward to working with you.
Thank you.
Commissioner Tiffany online would like to say a few words.
Mr. Noon, everyone, I'm sorry, I'm not there.
I also join in in welcoming Commissioner Miller.
It's a great group of people we're working with,
both the commissioners and staff.
And I know you'll enjoy it.
I'm sorry not there,
not only not to have some of that delicious ice cream,
but also to be next to my friend,
Chair, Madam Chair,
who is, I like to needle and, you know,
keeper laughing a little bit in between
the important stuff we have to do.
So I'm sorry, I'm not there.
Sheriff Haakone.
But anyway, I did want to comment that last month,
we had a town hall in San Luis Obispo County
in San Luis Obispo.
and it was very enjoyable. Town halls are an opportunity to get into some of the other
parts of California that maybe we don't get to as far as a full-blown CTC meeting. But we had two
days of presentations by the good people from San Luis Obispo County. I in particular was excited
to be there along with Chairman Falcone for the groundbreaking of the Bob Jones Trail,
which is an exciting trail. It's a portion that will be eventually connected, so it runs all the
way from San Luis Obispo to the ocean. So it's an exciting project for the people in that area,
And we were happy to play a significant part
in helping to fund it.
And then the following day got a very interesting tour
of the projects in San Luis Obispo County,
as we always do at these town halls.
So anyway, it was a great experience.
I'm sorry I'm not there with you all in person,
but I look forward to this meeting.
Thank you.
Thank you, Commissioner Tiffany and we do miss you.
I'm sure man is keeping me company here right next to me.
We look forward to seeing you in December.
I'll be there.
Any other comments from commissioners?
Full fast.
Yes, Vice Chair Cruz.
Thank you for the time, Madam Chair.
And also wanna welcome our new commissioner, Nancy Miller.
I look forward to working with her.
We have a great group of commissioners and incredible staff, who keeps us very much on
our toes with great information but always is willing to be very helpful.
I had the opportunity and honor to also attend a groundbreaking in Sacramento.
It was the I-80 American River Crossing, which was an important project for the area and
also had an incredible bike lane associated with that project.
And I think there was a lot of bikers who showed up to that ground breaking which was
really pleasantly, it was really good to see them be part of that whole project and they
seem to be really happy.
But also it's a major goods movement corridor in the area that I was raised in so that improvement
is going to be very much utilized by not just commuters but bikers and folks who move about
that region.
I want to thank our district 3 staff and our district director Sergio and his team for
putting that whole project together and moving it as fast as they did so thanks again.
Thank you Vice Chair Cruz.
Any other comments from commissioners?
Okay.
For me briefly first of all welcome to Crystal, Brooke and Janice to the CTC team and to our
our new commissioner, Commissioner Miller.
As you can already tell, it's kind of a very cordial,
kind of like a family environment here.
We do very intense work here on the CTC,
along with our partners,
but we try to actually like each other here.
And we really enjoy the work that we all do together.
And so we look forward to working with all of you
in all of your capacities and all the talents
you bring to the Commission. In that spirit of community, I also want to thank the transportation
community as a whole, from our regional partners to Caltrans and CalSTA and even within the
California Transportation Commission, our commissioners and CTC staff for supporting
a beloved colleague who experienced a medical emergency in San Diego, and she
gave me permission to to include her name, Kayla Giese, and I especially want
to thank the California Transportation Foundation and their executive director
Marnie Primer who really stepped up immediately to start a fund so that we
all can contribute and support Kayla during this time. She is doing very well
and we expect her to be back here and continuing to work with us and so I
just wanted to enhance you know Paul's comments about thanking everyone. It
really is a community here and you know even with all the really intense and
technical work that we do that we also care for each other as human beings. So
just wanted to thank you. Also just a little bit of quick business. I also had
the opportunity to attend a ribbon cutting in San Diego in the North
County part of the region. The opening of the third phase of the Inland Rail
Trail, which is a east-west connection that also provides opportunities for
active transportation and connection to the rail in North County and is part of
a continuing system that they are developing there and it was really
nice to see bike riders from five years old on up to 90 actually in their bikes
ready to to ride on that that trail and it's it's really refreshing to see our
investments there's there's some money that came from our ATP program and I
think LPP funding as well that went to that program and so I wanted to
congratulate Sandag and Caltrans and their partners NCTD as well as the
community in North County for that project. And with that that concludes my
remarks. Any public comment on our comments Justin? No there was no request
8. CalSTA Undersecretary
to comment from the public on the item. Okay great thank you. Moving on we have
of CalSTA, Undersecretary James Hacker joining us virtually.
Good afternoon. Can everybody hear me? We can't. Awesome. All right. Well, good
afternoon, everybody. I am Undersecretary James Hacker of CalSTA. Thank you for
having me. I am increasingly sorry not to be there in person today with all the
talk of Superior Dairy. I can confirm that it is amazing, so I'll have to make
it next time. But I'm happy to be here virtually to deliver CalSTA's first fall update to the this
year for the commission, which is also unfortunately the second to last CTC meeting of the year.
So with that, let's go to the next slide. As in past updates, I'll talk through our
core four priorities and we'll start as always with safety. So first, just an update on our 2025
state priority safety corridors. If you all will remember actually exactly one year ago today,
October 15, 2025, we launched the state priority safety corridors program in Los Angeles.
What's happened in the last year, Cal State and our partner agencies continue to deliver and
accelerate work on the initial round of three state priority safety corridors that were
implemented last year with early signs of improved safety. So just to run through those briefly,
first on Varner Road in Riverside County, we completed a high visibility Labor Day driver
safety campaign using changeable message signs urging motors to slow down and engineering work
on the physical improvements to the roadway are nearly done. By the end of this month the team
expects to finish design of the new safety improvements, submit their environmental
clearance documents and coordinate utility and right-of-way needs so we can move to construction
as quickly as possible. Moving on to Avalon Boulevard in Los Angeles our ongoing community
engagement and enforcement with which we've partnered with LAPD to deliver traffic safety
education at local schools, beginning to show results, and a capital safety project which will
involve pedestrian and roadway enhancement enhancements is moving forward. We received bids
in June and we're on track to award construction, on track to award a contract for construction for
that project in the very near future. And lastly, the final 2025 corridor was State Route 91.
We've completed a comprehensive traffic safety analysis of the SR-91 mainline.
That study identified five targeted countermeasures to be bundled into a
coordinated SR-91 safety improvement project, namely friction improvements for
anti-skid pavement, roadway departure prevention,
improved lane discipline at key leave areas,
pedestrian intrusion barriers, and speed management interventions.
The next step is to analyze our on and off ramps and plan additional safety
enhancements on those key spaces worth noting there are enforcement and
education efforts remain robust across all three pilot corridors and our
initial reviews of telematics and CHP data are showing promising downward
trends in both crashes and speed across all three corridors which we're
continuing to closely monitor but are very encouraging initial signs about our
work here obviously we're not stopping and we're not doing just one set of
of safety, priority safety corridors.
So we are in the process of kicking off the 2026 round
of state priority safety corridors.
The multi-agency working group
has completed a statewide data refresh
and is finalizing the selection
for our next set of three state priority safety corridors.
We've analyzed the top candidates in each category,
which are freeway, arterial and rural roadway,
using updated crash data from UC Berkeley.
And actually at this exact moment,
probably actually just a few minutes ago,
We held a press conference to launch the first of those corridors.
The first of those is I-880 South in Alameda County, a high-volume corridor which is currently
ranked number one in Northern California for fatal and serious injuries with heavy commute
and freight traffic where safe system countermeasures including speed management, roadway upgrades,
pedestrian improvements, et cetera, can yield significant safety gains.
So the Secretary and some of our team are down there right now kicking that process
and please stay tuned for announcements regarding the next two state priority
safety corridors in the coming weeks. Moving on to the zero traffic fatalities
task force. As a reminder we reconvened this task force last year as part of
this the secretary's agency policy on safety which we partnered with the
California HHS agency on. The reconvened zero traffic fatality task force
concluded its fifth and final meeting in August, completing a six-month collaborative effort
with stakeholders from state agencies, local government, health, and advocacy groups.
The task force developed a draft package of 19 recommendations to embed the safe system approach
across California's transportation programs. These proposals span things like speed management,
road design, infrastructure selection, traffic enforcement, vehicle technology, and safety
education. Those draft recommendations are now undergoing departmental vetting to assess
feasibility resource needs and implementation steps across the impacted departments and agencies.
CalSTA and HHS leadership would use this input to prioritize actions with a final report and
implementation plan to be delivered by the end of this calendar year. These efforts support our
state's goal to reduce fatal and serious injury crashes by 30 percent by 2035 and creating a path
to reach zero deaths by 2050. We'll move on to the next slide. We'll move on to equity. So we'll
start with the GOSERV California Men's Service Challenge press conference. It's pictured here
on the slide. Secretary Omashakan joined GOSERV director Josh Friday, Major General Matthew
Beavers of the California National Guard, and CNRA Secretary Wade Crofoot at the
GOSERV California Men's Service Challenge press conference on September 17th. Leaders took part
in announcing phase 2 of the service challenge, which promotes public service employment
opportunities to jump-start a career and create pathways to success. That effort advances Governor
Newsom's broader commitment, captured in Executive Order N3125, to lift up young men and boys and
create more opportunities for their success. This service challenge aims to address and mitigate
some of the issues identified in that executive order through impactful countermeasures such as
job recommendations, jobs, services, and treatment. Moving on to DBEs. First, I'd like to just note
the success of our small businesses here in California, particularly in the transportation
space. Caltrans continues to significantly exceed the state's 25% small business goal,
achieving 34.7% statewide participation across $2.5 billion worth of state contract expenditures.
Additionally, our Disabled Veteran Business Enterprise, or DBBE, participation remains
stable, with owned enterprises leading statewide performance at 3.7% ahead of the statewide
average of 2.1%.
On the federal side, California completed its reevaluation of the Federal Disadvantaged
Business Enterprise Program, or DBE, on July 20th and began accepting new DBE applications.
program as a reminder that program had been paused since October 2025 when the federal
government issued a new interim rule governing the implementation of the DBE program. Currently
there are 1,459 DBE and ACDBE firms in our database which is a solid number but is unfortunately
reduced from our pre-rule and pre-pause lists which included roughly 6,500 DBEs. Caltrans
and other California certifying agencies continue to do heavy engagement and one-on-one work to
increase the number of qualified firms using the new federal criteria. Additionally, there have
been several recent changes from USDOT. On September 24th, DOT published their final rule
on the DBE program which supplanted the interim rule that we had been working under. This final
rule made minor technical changes and requires agencies to send additional notifications to firms
and to USDOT regarding DBE certification with noted and specified deadlines for those notifications.
The big takeaway on our end is that firms who wish to be certified in the federal DBE program
should work with Caltrans to submit their materials and verify eligibility as soon as
possible, as there is now a federal cutoff of March 24, 2027. Caltrans is providing technical
support for those firms who are still working through these new requirements, and moving
forward, Caltrans will release a revised 2026 goal and methodology report proposing federal
DBE requirements in the coming weeks. We are keeping the DBE program moving and hope to
incorporate our adopted DBE goals into bid packages by the end of this year. We'll move
on to the next slide. Under climate action, I'll start with the BC2BC corridor event.
Secretary Omashakan delivered opening remarks and moderated a panel at the UC Davis ITS,
CalSTART, and Port of Long Beach Baja California to British Columbia BC to BC
ZEV corridor event on August 26th. This corridor requires collaboration and coordination between
three countries, namely the US, Mexico, and Canada to create the BC to BC ZEV corridor,
which will support coordinated planning and investment for medium and heavy duty ZEV charging
and refueling infrastructure along I-5 in the U.S. and corresponding highways in Baja California
and British Columbia. A key illustration and an excellent model of what partnership can look like
particularly across international borders in this space. Moving on to the Sustainable Communities
Task Force. In August we wrapped up the SCTF in our draft report which includes input from
task force members as well as the summary memo from UCITS. We are aiming to post that in the
coming weeks. This will begin a public comment period and welcome input and comment from the
public once that goes live. Please reach out to CalSTA staff for more information or provide a
public comment once that goes up and we will be noticing that once it's live for view and comment.
Moving on to CAPTIE 2.0, the climate action plan for transportation infrastructure.
We are in the thick of wrapping up our CAPTI 2.0 actions.
Many thanks to CTC staff and commissioners
for your work on reducing or building in mechanisms
to reduce VMT in the solutions
for congested corridors program
and the trade corridor enhancement program guidelines
as required or is called for under CAPTI.
We will be finalizing our CAPTI 2.0 progress report
and posting it in the coming weeks
to once again begin a public comment period.
We'll also be holding an online public forum in early November to discuss KAPTAI 2.0's progress again before finalizing and posting our sort of final wrap up by the end of this calendar year.
Please reach out to CalSTIS staff for more details and check our website and the KAPTAI page for more updates as we get closer to those milestones.
Moving on to the next slide, economic prosperity.
I'll start with the Sister State Resolution reception, which is pictured here.
On September 17, Secretary Omashakan delivered remarks at a follow-on reception to last spring's
California Lagos Sister State Resolution, which was authored by Representative Matt
Haney.
This event was emptied by CalSTA's own International Policy Advisor, Bonnie Nyago, so many thanks
to Bonnie for taking on other duties as required.
The resolution creates a structured framework for long-term collaboration between the states
California and Lagos, Nigeria, as well as to encourage knowledge sharing and economic ties
between the two regions. We focus on several key areas where both California and Lagos share
prominent global influence, namely technology and digital innovation, climate, energy, and
environmental stewardship, trade, infrastructure, and urban development, and many others. So we're
excited for that work to continue. Moving on to some key projects, the BNSF Caltrans High Desert
Corridor Operational Efficiency Project had its groundbreaking just two days ago on October 13th
in Hesperia. This important freight rail project represents a significant state investment,
including roughly $100 million through CalSTA's Port and Freight Infrastructure Program
and more than $30 million through the Trade Corridor Enhancement Program.
This project will add two freight rail staging tracks and extend the third main track for approximately 11 miles along the BNSF Cajon Subdivision.
This will improve the efficiency and reliability of freight movement between the San Pedro Port Complex, the Los Angeles Basin, the High Desert, and the rest of the western United States.
This project is a strong example of how CalSTA, CalTrans, the Commission, and our private partners in the freight space are leveraging complementary state funding programs
to advance our strategic goals
and improve our freight infrastructure statewide.
Speaking of PFIP, just a brief update
on the Port and Freight Infrastructure Program
as part of our broader commitment
to decarbonize the transportation space
and transition freight operations
towards zero emission technologies.
We are continuing to focus on the delivery
of zero emission projects
through our Port and Freight Infrastructure Program.
As a reminder, the PFIP program is roughly $1.2 billion
freight improvements statewide. 380.6 million dollars of that are specifically for zero emission
freight projects. Of that 380 million, we have allocated more than 270 million or 71 percent of
the total. We had spent 13.5 million of that total, although we anticipate that number will
start to climb rapidly in the coming weeks and months. At this time, we're not tracking any major
headwinds for the program. We're going to continue to work with our grant partners and with Caltrans
to continue to advance those projects and move them to groundbreaking
construction and completion as quickly as we can. Looking ahead on PFIP, this past legislative
session, the legislature extended the expenditure deadline for the first 800 million dollars of PFIP
through 2031, which ensures our port and freight infrastructure investments have sufficient time
for delivery. That will protect our large portion of our 1.2 billion investment and give implementing
agencies the runway they need to complete what are in many cases very complex port infrastructure,
zero emission, equipment deployments, and freight rail improvements which frankly just take a very
long time to design and build. So we're very appreciative to the Commission and to our legislative
partners for their support in that work and we're very excited to continue work in this program.
go to the next slide. Lastly, innovation. So I'll start with the CalSTA IT Leadership Summit,
congrats to Marcy Kabodi, who's pictured here, our Deputy Secretary of Technology here at CalSTA,
who dual hats as the CIO at Caltrans, and to her team for developing and putting on the fourth
annual CalSTA Technology Leadership Summit, which took place September 25th. This serves as an
opportunity for our IT teams across each of our member departments to connect and collaborate.
It's gained significantly in popularity in recent years.
The first year of the leadership summit, we had 40 attendees.
This past year, we had 95, which I think really highlights
the importance of technology in the transportation space
as well as the opportunities for cross-collaboration like this to drive
value and help improve the ways in which we're leveraging technology
to better deliver projects and to better help the traveling public.
Moving on to autonomous vehicles, following the adoption of DMV's
updated AV regulations in April which authorized heavy-duty AVs on state roads. The department
has now permitted three manufacturers to test heavy-duty trucks with a safety driver, importantly
here in the state. Those three firms are Aurora Innovation, Kodiak, and Gatic. All three companies
have long-standing offices and ties with the state. And as they begin testing with just a handful of
vehicles here in the near future, they will comply with all Federal Motor Carrier Safety
administration and California requirements for commercial vehicles and will also be subject to
strict oversight and reporting under DMV's AV rules which does include regular data reporting
allowing us to keep a pretty close eye on what they're doing here in the state.
And lastly, just a brief update on the National Electric Vehicle Infrastructure or NEBI program.
As a reminder, this was a federally funded program to support the build out of EV charging
infrastructure on state highways. Importantly, all of California's NEVY program funds are now
under obligation, which protects them from federal clawbacks and repurposing. Now this is a huge
milestone and allows us to really deliver on the full promise of the program. As an update,
cycles one and two projects are now beginning to move into construction with three projects
expected to come online this fall and several more rapidly approaching right-of-way clearance
and construction milestones thanks to a streamlined process that we worked out with FHWA.
Cycle 3 projects were awarded in July with 58 sites selected and moving towards construction.
Cycles 4 and 5 applications closed this spring and will be awarded here in the coming weeks.
In cycle 6 the final NEBI solicitation which includes 79 million dollars in new funding for
EV charge infrastructure will close later this month at which point we will work to make awards
and again get those projects into the construction timeline or pipeline as quickly as possible.
Our efforts this NEBI program is largely administered by the CEC but Caltrans is
is a key part of moving those projects towards completion and so our efforts are really focused
on accelerating project delivery and making sure that we are moving those projects into
construction and from there to completion as quickly as we can. If we'll go to the next slide
that concludes my report includes my remarks thank you all for being here today uh somebody
please eat some of that ice cream for me and i'm happy to take any questions that you may have
thank you mr under secretary any public comment no there was no requested comment on the item
okay thank you any questions comments from the dais on the undersecretary's very thorough report
Okay, seeing none, thank you James for your report and it was again fun sitting next to you
at Mobility 21 and being part of a panel to celebrate their 25th year in existence
and talk to quite a bit about the future of transportation and funding and looking back
at the last 25 years of their existence and so it's always good to partner with you on events.
9. Caltrans Director
and just the work that we do so thank you. Thank you. Moving on to our update from Caltrans,
our Chief Financial Officer from Caltrans, Stephen Kett. Good to see you, Stephen.
Thank you, Chair. And before I begin my prepared remarks, I'd like to say I appreciate the comments
that were made earlier about the worker fatalities that have occurred over the last couple of months.
Um, I made similar comments at the last commission meeting in San Diego.